Linda Lange, our Trustee, is leading the project of roof and gutter repair. She separated this project into three separate phases. The Phase-One is completed. Phase-Ttwo the PreSchool Saffet has been replaced June 18, 2020. Phase-Three will come soon.
|
|
Improvements happening Now 2021:
|
|
Ed Leathers and Ken Calloway are keeping the grounds and cemetery free of weeds and high grass. The Cemetery requires hours of care and honoring those who died in previous wars. We several unmarked graves near the front gate.
Ed. needs help, are you up for the challenge and love required to maintain a beautiful church? |
|
Jake and Linda Jacob are leading the rewiring of the Kitchen Prep table enhancements. Jake ran new wiring to the table so that it may be used with max efficiency. Together they are improving the safety of the kitchen for all groups to use safely.
A new Can Opener with a blue knob has been installed. It is sturdier and safer than the previous one. |